Matt’s Weekly Shop Update – Nov 3 2014

This week I finished up a few more end grain cutting boards and build some storage shelves to go on the wall behind my jointer but the biggest thing this week is I slabbed the large log that was dropped off last week.  I was able to get 2 pieces of 12/4 and 2 of 16/4.  The 12/4 slabs contained 75 board feet and the 16/4 slabs contained 100 board feet each so they were very difficult to move based on their weight (and size).

Sponsors
Recent
Matt's Weekly Shop Update

New Shop, Chair Kits, Workbench Kits

Chair Kits – https://mattcremona.com/product-category/chair-kits Workbench Kits – https://mattcremona.com/product-category/workbench-kits Viewer Projects Kitchen Step Stool by Nick The top is made from a 5/4 cherry off-cut left

Log Trailer

Making Ramp Mounts for my Trailer

I wanted aluminum ramps so they’d be lightweight and I bought some vs making them myself because after building this trailer, I just wanted to

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.