Matt’s Weekly Shop Update – Nov 3 2014

This week I finished up a few more end grain cutting boards and build some storage shelves to go on the wall behind my jointer but the biggest thing this week is I slabbed the large log that was dropped off last week.  I was able to get 2 pieces of 12/4 and 2 of 16/4.  The 12/4 slabs contained 75 board feet and the 16/4 slabs contained 100 board feet each so they were very difficult to move based on their weight (and size).

Sponsors
Recent
Chair Kits

Chair Kit Style 6 Assembly Instructions

Order Chair Kits here: https://www.mattcremona.com/product-category/chair-kits What You’ll Need Sander with 120, 180, and 220 grit Sandpaper Router 5/16″ or greater roundover bit (for the front of

Post Frame Barn Build

So Many Purlins

Welcome back to the build!  Last time we got all the trusses flown in, and this time, I’m going to go to purlin purgatory. I’m

Post Frame Barn Build

Setting the Trusses

Welcome back to the build!  Yesterday we got those two trusses up there, and today we’re to continue on with making a building. We have

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.