Matt’s Weekly Shop Update – Nov 24 2014

This week I only have a few small updates.  I spent one evening trying to cut the Kawai Tsugite joint.  I got pretty far into the process but thinking about the geometry gave me a headache!  On the upper case of the secretary, I glued up the face frame and I installed the vertical dividers. So since I didn’t have too much to talk about, I installed the fixed shelf “live”.  The install covers stopped dado joinery where you want to lap the shelf over the case side.

Sponsors
Recent
Log Trailer

Making Ramp Mounts for my Trailer

I wanted aluminum ramps so they’d be lightweight and I bought some vs making them myself because after building this trailer, I just wanted to

Woodworking Projects

Walnut Dressing Vanity Build

To start things off, I’ll make the panel which will become the sides and top. While that’s sitting in the clamps, I’ll prep the material

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.