Matt’s Weekly Shop Update – Nov 17 2014

This week I made a bowl blank out of epoxy and old wires I was getting rid of.  I ran out of epoxy in the process.  I had some fun stacking the 9/4 slabs with the help of my truck. I spent some time working on the upper case of the secretary.  I built the faceframe (including the scroll board) and most of the case.  I decided to modify the plans that I am working off of to include a row of drawers at the bottom. Lastly, I picked up a load of freshly sawn walnut.  I have it all stacked and drying.

Sponsors
Recent
Matt's Weekly Shop Update

New Shop, Chair Kits, Workbench Kits

Chair Kits – https://mattcremona.com/product-category/chair-kits Workbench Kits – https://mattcremona.com/product-category/workbench-kits Viewer Projects Kitchen Step Stool by Nick The top is made from a 5/4 cherry off-cut left

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.