Matt’s Weekly Shop Update – Nov 2, 2015

This week I made a lot of progress on the crib build.  I finished prepped and applied finish to the frame and spindles, assembled the side assemblies, and moved the entire frame into the house.  I started cutting the brass pins that will hold the long rails and finished making the mattress supports.  We had some great weather over the weekend so I spent some time working on the log lifting arch for my trailer.
The Matt & Matthew Show: https://www.youtube.com/channel/UCGyTDCoaGS921S1GKX3t7zg

Paul’s Channel: https://www.youtube.com/channel/UC3CrTFLtWuBYbOFuMA3przg

Popular Products
Recent Posts
Home Addition & Renovation

Integrated Shelf Lights and Under Cabinet Lighting

Welcome back to the kitchen build! This time, I’m going to be working on cabinet lighting, which includes both under-cabinet lighting and in-cabinet lighting.  Every

Home Addition & Renovation

Spraying the Trim and Cabinets

Welcome back to the kitchen build. This time I am hopefully getting through the rest of the trim detail, and then painting everything.   I am

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.