Matt’s Weekly Shop Update – Mar 9 2015

This week in the shop I made my final decision on how I will be applying the bonnet top to the secretary and I installed the lockset on the doors.  I also spent some times making the templates for the finals and urns.  I’ll be using the scraps from making the moldings to make those. I am also turning some bowls to be donated to The Habitat For Humanity’s annual silent auction.

The Matt and Matthew Show:
https://www.youtube.com/channel/UCGyTDCoaGS921S1GKX3t7zg

Sponsors
Recent
Post Frame Barn Build

Temp Power, Garage Door, Floor Sealing

Welcome back to the build. We’re starting to get to a point where the barn is actually going to be a functional and useful building,

Equipment

New Tracks for the Mini Skid Steer

Welcome back to my backyard.  My skid steer needs some new tracks, so I thought we’d do a little tutorial on how to change the