Matt’s Weekly Shop Update – Jan 19 2015

This is my 1 year anniversary of making videos!  After a year making these videos, I finally talk a bit about why I started.  This past week, Nick Ferry was with me in the shop learning to hand cut half blind dovetails. In the shop I continued working on the upper case for the secretary.  I got the face frame attached, cut and prepped the horizontal cubbyhole dividers and prepped the vertical cubbyhole dividers. The most exciting thing that I started was the fan carvings.  I’ve never done any carving before, so these will be a learning experience.  So far I’ve just roughed out the curve.

Links:
Nick Ferry: https://www.youtube.com/ferrynick
Ferry Talk: https://www.youtube.com/FerryTalk
BrainPick: http://www.iliketomakestuff.com/brainpick/

Popular Products
Recent Posts
Home Addition & Renovation

Integrated Shelf Lights and Under Cabinet Lighting

Welcome back to the kitchen build! This time, I’m going to be working on cabinet lighting, which includes both under-cabinet lighting and in-cabinet lighting.  Every

Home Addition & Renovation

Spraying the Trim and Cabinets

Welcome back to the kitchen build. This time I am hopefully getting through the rest of the trim detail, and then painting everything.   I am

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.