Matt’s Weekly Shop Update – Feb 16 2015

This past week, I worked on dovetailing the drawers for the upper case and got the gooseneck moldings roughed out.  The moldings still need to be cleaned up, cut away from the blank, and mounted to the case but things are moving along!

Video Woodworkers
http://videowoodworkers.com

The Matt and Matthew Show
https://www.youtube.com/watch?v=w0EvmEdI0f4

Matthew Morris
https://www.youtube.com/mmwoodstudio

Sponsors
Recent
Log Trailer

Making Ramp Mounts for my Trailer

I wanted aluminum ramps so they’d be lightweight and I bought some vs making them myself because after building this trailer, I just wanted to

Woodworking Projects

Walnut Dressing Vanity Build

To start things off, I’ll make the panel which will become the sides and top. While that’s sitting in the clamps, I’ll prep the material

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.