Matt’s Weekly Shop Update – Feb 16 2015

This past week, I worked on dovetailing the drawers for the upper case and got the gooseneck moldings roughed out.  The moldings still need to be cleaned up, cut away from the blank, and mounted to the case but things are moving along!

Video Woodworkers
http://videowoodworkers.com

The Matt and Matthew Show
https://www.youtube.com/watch?v=w0EvmEdI0f4

Matthew Morris
https://www.youtube.com/mmwoodstudio

Popular Products
Recent Posts
Home Addition & Renovation

Integrated Shelf Lights and Under Cabinet Lighting

Welcome back to the kitchen build! This time, I’m going to be working on cabinet lighting, which includes both under-cabinet lighting and in-cabinet lighting.  Every

Sourcing

Picking Up Logs with my Son

We’re going to do a log pickup today, so I am getting the arch ready to go back onto the trailer. When I take the

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.